on ‎2022 Nov 09 6:41 PM
Hi friends,
with the features of the DWC we don't need a model within the SAC. We can directly access the Reporting View inside DWC and build our Story. Super cool!
But what about SAC planning. Usually we need to import data into the SAC model and build our planning scenario on that model. Can we do planning without aqcuiring the data by using the DWC connection?
Looking forward for your answers.
Thnaks in advance,
Ismail
Request clarification before answering.
My feeling is that with SAC / DWC there are more restrictions than ever before. I don't know how many old and new variants there are now in SAC all working in parallel, optimized mode, old mode, new story mode, old mode, new model, classic model, new explorer, old explorer and with planning it's way more replication than needed. Besically SAP should have thought about a central storage in a DWH before designing all that and maybe SAP should have also take a look at lumira before designing a story and an application mode in SAC (that's exactly the same story with lumira - I see no learning curve at all). It's like knowing doing something bad and redesigning it after that although this was absolute obvious the first approach is nonsense.
But back to topic. Is the final goal that the replication will not be necessary anymore for SAC Planning and SAC can use the data in DWC directly or will we always have this kind of three way synchronisation if FI-CO Data is used the replication back to ACDOCA / ACDOCP is also needed. At least the masterdata replication is unbelievable old fashioned (especially hierarchies with 3! loads)
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 15 | |
| 9 | |
| 6 | |
| 4 | |
| 4 | |
| 4 | |
| 3 | |
| 2 | |
| 2 | |
| 2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.