    Loading Time by Crane to be displayed on Order confirmation and Delivery confirmation (outbound)

    Dear All,I have one requirement received as below:Customer wants loading done by Crane for material  to be included exactly with Time and agreed Rate on delivery note copy and order confirmation.Currently on delivery note it is appeared as below:Mate...

    SapScm by Participant
    • 1560 Views
    • 3 Comments
    • 0 Likes

    check this out

    Have a look at SAP Interactive Value Journey for Construction to have a clear view of the process supported by SAP in the construction sector...  Manage Opportunities Plan Project Manage Procurement Execute Project let us know if you find this useful...

    fdetoma by Product and Topic Expert
    • 1739 Views
    • 1 Comments
    • 1 Likes

    Top 20 reasons for claims and disputes in construction

    I came across a recent study about the top 20 reasons for claims and disputes in construction projects. It highlighted the fact that three design-centric factors – incorrect, late, or incomplete design information – were clustered within the global r...

    Integration

    Hi. I am new to the forum.  I have followed SAP for at least 30 years. I was told about the integration capabilities.  As a programmer since 1979, I have always tried to find simple solutions for small business.  I am back on the research of SAP and ...

    BOM multilevel cost estimate with phantom indicator on in some children

    I have a multilevel BOM where a child (who has a BOM) has the phantom indicator ON and in the MRP2 panel has procurement type E and special procurement blank. The costing estimate consider also the cost of that child ( the cost of the relate routing)...