SAP for Engineering, Construction, and Operations Discussions
cancel
Showing results for 
Search instead for 
Did you mean: 
Read only

Reassign component allocation

Former Member
0 Likes
636

Hello Team,

I am asking about the possibility of the reassign the allocation of a component in all materials.

I have a component what is used by many materials. The place of operation is changed and I have to reassign the component in all of the materials. Are there any possibility to do it easily and not one-by-one in all materials?

Thanks in advance for your answers!

Br,

Laszlo

0 REPLIES 0