‎2012 Jun 29 10:26 AM
HI all,
I am getting below errors while populating fields using BAPI:
E Inspection Plan Not Created
E
S Dynamic modification criteria are proposed according to task list usage 5
E Unit ****** cannot be converted to unit EA from material master PLA1111111111153
E Material-routing assignment: Consistency check not successful
E Operation unit of measure ****** does not exist
E Consistency check not successful when creating operation
E Method Test123, version , plant 0108 is not available
A Inspection characteristic cannot be uniquely assigned to one operation - Error in parameter INSPCHAR
E Method Test123, version , plant 0108 is not available
A Inspection characteristic cannot be uniquely assigned to one operation - Error in parameter INSPCHAR
A Inspection characteristic cannot be uniquely assigned to one operation - Error in parameter INSPCHAR
A Inspection characteristic cannot be uniquely assigned to one operation - Error in parameter INSPCHAR
A Inspection characteristic cannot be uniquely assigned to one operation - Error in parameter INSPCHAR
A Inspection characteristic cannot be uniquely assigned to one operation - Error in parameter INSPCHAR
A Inspection characteristic cannot be uniquely assigned to one operation - Error in parameter INSPCHAR
But..when i use the same data and execute directly from BAPI(without writing the code in se38)...it is executing correctly...with no errors..
How can i solve above errors..pls help...
‎2012 Oct 05 11:23 AM
Hi ,
I am also getting the same issues.. Are you able to solve these issues..if so please let me know how..it will be very useful...
Thanks
Swetha