cancel
Showing results for 
Search instead for 
Did you mean: 
Read only

SAP ECC Client Copy Inputs

Former Member
0 Likes
242

Dear Users,

We have the following test environment: AE1(ECC Client 320) --> AB1(BW Client 400)

As a pre test for a project scope we are planning to make a client copy of ECC AE1 320 to AE1 310.

My question is do i need to perform any configurations/changes in BW client 400 system to point to the new AE1 310 client? As we have many delta pointer loads and etc.

Once the pre test is done then i have to re point the BW system to AE1 320 client.

Please suggest what needs to be taken care or to be done?

Regards

Zabi

View Entire Topic
RamanKorrapati
Active Contributor
0 Likes

Hi,

Test Environment - AE1(ECC Client 320) --> AB1(BW Client 400).

Client copy AE1 320 to AE1 310. Fine.


Want to test AE1 310 thru AB1 BW 400?

If yes then have connections between AE1 31- to AB1 400? if yes then no issues about delta pointer.

if not then you/basis need to provide connections and later test data sources.

if got any rfc issues, cross versify logical mappings and later do the testing.

Due to the copy prod ECC entries will be copied as source, so with basis team help, change the tale entry -RSLOGSYSMAP entries.

Thanks