Dear All,
we have 2 server ecc 6.
1. production
2. backup
right now my sap bw connect to ecc production.
we have plan to use backup instead of production
is it enough just simply changing the IP and host name at the current RFC connection.
from IP production to IP backup server ?
without creating new RFC connection ?
is there any procedure that we have to do before or after the changes ?
please advice
Request clarification before answering.
hi,
Not only Rfc, if logical system between ecc prod and back up are different, you might need to run Bdls for ecc in BW system.
You should create new or change existing source system in Rsa1, partner profiles..BDLS takes care of mentioned steps.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 5 | |
| 4 | |
| 4 | |
| 3 | |
| 2 | |
| 2 | |
| 2 | |
| 2 | |
| 2 | |
| 2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.