Hi Gurus, Our client wants to rollout EHS DG and PS to its Joint Venture companies in the same region. The basic idea would be only technical copy of the existing system. My question would be what are the activities need for rollout like any customizing, Template changes etc.. will there be any major activities involved for this roll out. Help is highly appreciated ..

View Entire Topic
Former Member
0 Likes

Hi,

Inputs like the version, system size, Master data are required to analyze the issue. You need to re-configure some applications like WWI and GLM ( if required ). There are other criteria like interfaces ( eg: RFC connections ) and Integrations with SD and MM. A complete study of these pre requisites are required before going for a roll out or upgradation

Regards

Srinivas