Hi,

I need to manage a stability study with a testing schedule to create inspection lots as follows:

3 months, 6 months, 9 months, 12 months, 18 months, 24 months, 36 months, 48 months.

How do I do?

Can you help me? I'm apologize for English.

G

0 Likes
View Entire Topic
Former Member
0 Likes

Thanks Sanil, it work!

I still have two questions:

1) Using your solutio the inspection lots are created considering the start date, right? So if I create a inspection lot after one month and then the next three months after its predecessor, in fact I have set as an offset: 1 Month and 4 Months?

2) If another material for my stability plan is different, for example 3 months, 6 months, 12 months, 24 months. I have to create a new maintence strategies (T-code IP11) ZQSTABI with its packages?

G.

Former Member
0 Likes

Hi,

If your different material is having different plan then you need to create seperate different strategy for that material as 3 Month,6 month ,12 Month ,24 month

Regards

SANIL