Hi,
I need to manage a stability study with a testing schedule to create inspection lots as follows:
3 months, 6 months, 9 months, 12 months, 18 months, 24 months, 36 months, 48 months.
How do I do?
Can you help me? I'm apologize for English.
G
Request clarification before answering.
Thanks Sanil, it work!
I still have two questions:
1) Using your solutio the inspection lots are created considering the start date, right? So if I create a inspection lot after one month and then the next three months after its predecessor, in fact I have set as an offset: 1 Month and 4 Months?
2) If another material for my stability plan is different, for example 3 months, 6 months, 12 months, 24 months. I have to create a new maintence strategies (T-code IP11) ZQSTABI with its packages?
G.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 14 | |
| 13 | |
| 7 | |
| 6 | |
| 5 | |
| 4 | |
| 3 | |
| 2 | |
| 2 | |
| 1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.