Dear All,
can any one please tell me what is setup time, process time, taredown time.
thanks and regards,
irfan
Request clarification before answering.
hI aLI,
bEFOR YOU LOOK FOR DEFINITION OF setUP ETC U NEED TO KNOW STANDARD VALUES.
Standard values are planned values for the execution of an operation and are maintained in the operation. Typical standard values are, for instance, set-up and processing. The execution time, costs and capacities are calculated in operations using formulas from the work centers and standard values from the operations.
SO basically set up ,process ,tear etc are STANDARD VALUE paerameters.
CHECK IN WORK CENTRE <BASIC DATA VIEW>
Set up ,process tear down are basically used to breakdown operational activities in Discrete manufacturing.
set up means : time required to setup a job on your work centre(M/c).E.g setting up of blank rod on your lathe m/c
process : time required to process the job on m/c(e.g turning of blank rod on lathe)
tear down : time required for diengaing u r job form W?C.e.g removing your finished job and placing them in the trays.
The basic idea of these breakup of activities is for Finit scheduling,costing etc.
The best way to relate this with SAP is to CHECK sap ides or library.
THNX
HOPE IT HELPS.
HKR
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 13 | |
| 12 | |
| 7 | |
| 6 | |
| 6 | |
| 4 | |
| 3 | |
| 2 | |
| 1 | |
| 1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.