Hi, ALL
Please explain me the detail steps for through out cycle of sampling procedure in QM.
Pls revert Urgent.
Thanks in advance,
Vishal
Request clarification before answering.
Hi,
You can create Sampling procedure through trx QDV1.
But let me know, in which scenario you are going to use Sampling Procedure.
Best of Luck,
SADAN
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Vishal,
As you have explained in this thread is accurate even through proceed as follows,
T.Code QDV1
Assignments:
Sampling Type: fixed sample
valuation mode: manual valuation
Inspection points: w/inspection points
next screen
control chart Type Nil
Sample:
size 1
frquency : 1
I don't know whether it will much helpful for you but you definitly will come to close of your scenario.
Best of Luck
SADAN
Hi,
Set indicaor "sampling procedure" in the MIC
System will ask you assign sampling procedure at the MIC Level in the inspection.
Don't assign Sampling procedure at inspection type level in the material master.
following indicators should be set at inspection type level
inspection with task list, check charac, automatic assignment.
pl generate new inspection lot after above settings
Regards,
SADAN
| User | Count |
|---|---|
| 13 | |
| 12 | |
| 6 | |
| 6 | |
| 6 | |
| 4 | |
| 3 | |
| 2 | |
| 2 | |
| 1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.