06-19-2012 3:25 PM
nevin_philip Participant
4304 views 17 comments Go to solution
0 Likes
SAP Managed Tags
Subscribe

We have a CO production order for which the material is backflushed.Observed that movement type 131 has happened for the material.It is also observed that 531 and 261 movement types has also happened for some materials.How is the flow normally and how does it happen?The user was trying to reverse the backflush document when he faced the issue for a material saying deficit of stock in sloc.Can somebody explain the flow of this process and how these movement type like 131,531 and 261 appear while backflushing and what propbably could be the issue while reversing the document

0 Likes

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Likes

Hi Nevin,

Adding on the observations above -

When we post the Back flushing, we are posting the following goods movements as well -

a) Goods Receipts for the finished products               --> with Movement type 131

b) Goods Receipts for the By-products/Co-products** --> with Movement type 531

c) Goods Issues(consumption) of components#          --> with Movement type 261

** Co-products/By-products are maintained with 'negative' quantity in the BOM --> which means, the system would need to add the inventory for these products,... when producing the Header item.

# Components are maintained in the BOM with positive quantity --> And these will reduce inventory and post to the consumption

All these movements are posted with a single material document.

And when we reverse the material document or backflush entry, all these three earlier postings get reversed with 132, 532 and 262 movements respectively.

Regards,

Senthil

nevin_philip
Participant
0 Likes

Hi senthil,

Thanks for the response.Observed that 261 and 531 has happened for same material.Is this the reason why the error happened?

Regards

Nevin

rupesh_brahmankar
Active Contributor
0 Likes

Dear,

Cancel the material document through MBST and do the posting again. I hope it will solve this issue.

Regards,

R.Brahmankar

Former Member
0 Likes

Hi Nevin,

Please check the BOM, if the same material is used as a component in multiple lines -

  • one line item with a positive qty (triggering 261 movement)
  • another line item with a negative qty (triggering 531 movement)

Thanks

Senthil

Former Member
0 Likes

Dear Nevin,

1.During an assembly backflush in T.Code MFBF,as per the REM profile the system confirms the

GR,GI and the activities.131 movement is referred for GR and 261 is referred for GI and 531 for

By-products.

2.When you perform a document specific reversal using MF12 or document neutral reversal using

MFBF,the system carriesout corresponding reversal movement like 132,262 and 532.

3.Now only if the stock of the product (that was recieved through 131 movement) is available in

the respective storage location,you can peform a reversal of backflush.

Check and revert back.

Regards

Mangalraj.S

Answers (4)

Answers (4)

nevin_philip
Participant
0 Likes

Hi all,

i checked in mf41 and something strange with this document created.There is an exclamation mark  near the posting date and on reversal it says unrestricted stock issue.Kindly suggest

Regards

Nevin

Former Member
0 Likes

Hi Nevin,

Please check if the stocks exist for the items (transaction MMBE).

Also, can you attach the screenshot of the error?

Thanks

Senthil

nevin_philip
Participant
0 Likes

Hi senthil,

While reversing the stock should be updated right.like 262 and 532 movement type should occur for the material so its strange that the deficit of SL is coming

Regards

Nevin

Former Member
0 Likes

Hi Nevin,

Can you attach the screenshot of the error?

Thanks

Senthil

svs_sap
Active Contributor
0 Likes

Hi Nevin,

During cancellation of document or reversing you do not have the component stock, existing might be consumed by other reservations.

Check the history for the stock in MB51 and analyze.

Regards,

Sharat

nevin_philip
Participant
0 Likes

The CO production order is created a material. In the BOM of the material we have only 1 material.However inside that material we have a set of other materials.Not sure how these materials are being picked up for Goods Movement

Former Member
0 Likes

Hi Nevin,

If you have only one component(A) in the first level BOM, and the BOM components under A are getting  back flushed, it is obvious that the item A is set up as a phantom item.

At the time of back flushing, system explodes the BOM for the phantom item, picks the 'Actual' items under the phantom item, and posts goods issues.

--> you can check if the phantom indicator is showing up against A in the first level BOM

--> Material master for A should have special procurement key set as 50 (check MRP2 view)

Thanks

Senthil

Message was edited by: Senthil Kumar Akash Sampath

svs_sap
Active Contributor
0 Likes

Hi Nevin,

You can check for phantom indicator set for the component at first level, and that will be the reason it got exploded and below level items picked for back flush as explained by Mr Senthil.

To reverse it you can cancel the material document or in MB1A you cancel with respect to order reference in the menu option selection.

Regards,

Sharat

Former Member
0 Likes

Hi nevin

Normally we use 131 movement type for Repetitive Manufacturing good receipt.

R u using MFBF transaction for backflusing ? U want to reverse the all 131, 261 and 531 ?

If so, what ever the movements happened earlier, the stock should be there in that perticular location for all good receipt materials , and conusmed materials and as well by products.

So that the reversal can be done.

Santhosh.

nevin_philip
Participant
0 Likes

Thanks santhosh for quick response.while reversing the document using mfbf there was an error mentioing that there is a deficit of stock in sloc.While reversing the backflush the goods movement should be reversed automatically keeping th stock back to sloc.Dont know why this error is occuring.Can you assist.Thanks

AnupPatil
Active Contributor
0 Likes

Hello Nevin,

Depending upon your master data setup (material,BOM, routing & backflush) along with REM Profile settings, system will post relevant documents with corresponding movement types.

Like GR with 131, Goods Issue with 261 & Byproduct with 531. Check REM Profile settings in SPRO.

With reversal of backflush, below things happen in system:

- GR is reversed and the accompanying material document and full

backflushing document are indicated as cancelled.

- Goods issues for the components are reversed, that is, the component quantities are

posted back.

- The activities are reversed.

- Depending on your settings in the repetitive manufacturing profile, the system either creates a planned order for the reversed quantity or the system does not create a planned order in which case the planner has to check the situation.

 

Please check & revert what exactly error/issue you're getting during backflush reversal.

Regards,

Anup

nevin_philip
Participant
0 Likes

Hi Anup,

Thanks for the quick response.while reversing the document using mfbf there was an error mentioing that there is a deficit of stock in sloc.While reversing the backflush the goods movement should be reversed automatically keeping th stock back to sloc.Dont know why this error is occuring.Can you assist.Thanks