cancel
Showing results for 
Search instead for 
Did you mean: 
Subscribe

Dear all,

for one materail i am trying to creat PRD order

order type XXXX is mainatined with refernce operation set slection in OPL8

and refernce opration set is already created in CA11

validity is ok

system is throwing following Mssg

while creating PRD order

No default value mainatined for op.generation for order type XXXX (materail YYYYYY)

Regards

kumar

0 Likes
View Entire Topic
rupesh_brahmankar
Active Contributor
0 Likes

Dear,

Please check the valdity dates/qty and status of the referance operation set.

You need to select the referance opeartion set during the order creation

Default operation for the plant and order type combination in T Code OPJG.

Regards,

R.Brahmankar

Former Member
0 Likes

Dear Brahmankar,

Thanks for ur reply

in OPL8 i have the following settings

1) Application - p

2) selction id - 05

3) Sequence exchange - 0

4) Task List Type - s

5) AltTaskListApplication - blank

6) Routing Selection - 02

7) alternative sequences - checked

😎 Check op. deatils - checked

9) Roting text - checked

Apart from this what should i do

Plz clarify

Regards

kumar

rupesh_brahmankar
Active Contributor
0 Likes

Dear,

Application P AltTaskListApplic. blank

Selection ID 01 Routing Selection 2

Task List Type S Reference Operation Set.

Go to OPJF and check the slection iD here you need to set task list type S in selection priority.

Regards,

R.Brahmankar

Former Member
0 Likes

Dear Brahmankar,

Selection ID - 05 or 01

for refernece operation set it should be 05

Regards

kumar

former_member196398
Active Contributor
0 Likes

Kumar,

If the criteria mentioned by me is ok. Then check in transaction OPEB for Selection ID "05", which you have assigned in OPL8, whether tasklist Type "S" with correct usage and Status is set.

Regards,

Prasobh

Former Member
0 Likes

Dear Prasobh,

but the order may be exploding the PP-Master data for a past date based on the basic start and finish date of the order.

Plz clarify ur above statement

unable to undersatnd

Regards

kumar

Former Member
0 Likes

Dear all

Thanks for ur reply

in OPL8 i have the following settings

1) Application - p

2) selction id - 05

3) Sequence exchange - 0

4) Task List Type - s

5) AltTaskListApplication - blank

6) Routing Selection - 02

7) alternative sequences - checked

😎 Check op. deatils - checked

9) Roting text - checked

Reference operation set is valid from is 27.08.09 & valid to 31.12.2009

no deletion flag set

Apart from this what should i do

Plz clarify

Regards

kumar

Edited by: kumar kumar on Sep 14, 2009 2:17 PM

former_member196398
Active Contributor
0 Likes

Kumar,

PP-master data would be exploded based on Basic start date of the Order, assuming I have a backlog Planned order or Manually creating an order with Start date as 01.07.2009. In this case system would explode the PP-master data with date as 01.07.2009 and look for valid BOM/Routing/Production versions as on that date. If in your case you have created the Referance routing with valid from today, system would not be able to find this routing.

Regards,

Prasobh

Former Member
0 Likes

Thanks Prasobh,

my Reference opearation set validity is

27.08.2009 to 31.12.2009

what else should be checked

should something be checked in materail master

Plz clarify

Regards

kumar

former_member196398
Active Contributor
0 Likes

Kumar,

Nothing from Material master side for this Issue.

Have you checked in transaction OPEB for Selection ID "05", which you have assigned in OPL8, whether tasklist Type "S" with correct usage and Status is set.

What is your order start date?

Regards,

Prasobh

Former Member
0 Likes

Dear Prasobh,

in OPEB following settings are present

1) selection id - 05

2) SP - 1

3) task list type - S

4) plan usage - 1

5) description - production

Order start date, right now i am trying to creat it, but it's not allowing me

Plz let me know what else is required

As the issue is in Production server

Plz let me know

Regrads

kumar

Edited by: kumar kumar on Sep 14, 2009 2:27 PM

Former Member
0 Likes

Dear all,

in OPL8, what should be for reference operation set,

1) selction id

2) Routing selection -

Regards

kumar

Edited by: kumar kumar on Sep 14, 2009 2:52 PM

Former Member
0 Likes

Thanks to all,

This thread is closed

Regards

kumar