Material replacement

Former Member
0 Likes
4,816

Hi,

My client have following scenario

he created one Sales order with material 'X' (MTO)

at the time of delivery my client is asking If materal 'X ' is not ready then system should give pop up

message where he will get list of materials which will replace to material 'X' & he will select

one material from that list.

my question is this scenario is possible?

if yes how to map it?

regards,

akshay

View Entire Topic
Former Member
0 Likes

Hello,

For a MTO, the sales order is trigger for delivery date. based on your avilability check settings , the system will propose a possible date

what does the requirement means the delivery not available means ?

you can still congfigure the senario with material determination . in that you can set the requriement that if the material is not produced on the customer required date , the system shoulod propose alternatives

check the foroum for many threads to configure the material determination

Hope this helps

Thanks

akasha

Former Member
0 Likes

Hi,

Thnx for your replies,

but Material determination is not the solution

i want material to be get replaced at the time of delivery

regards,

Akshay

bcrao
Active Contributor
0 Likes

Hi,

You have control for these also in Material determination.

Whether mat. determined in sales order only or Delivery too

Check it

Chidambaram

Former Member
0 Likes

dear chidambaram,

Thnx for valuable reply

for delivery what settings I need to do in material determinatin

regards,

Akshay