on ‎2009 Mar 21 6:39 AM
Hi,
My client have following scenario
he created one Sales order with material 'X' (MTO)
at the time of delivery my client is asking If materal 'X ' is not ready then system should give pop up
message where he will get list of materials which will replace to material 'X' & he will select
one material from that list.
my question is this scenario is possible?
if yes how to map it?
regards,
akshay
Request clarification before answering.
Hello,
For a MTO, the sales order is trigger for delivery date. based on your avilability check settings , the system will propose a possible date
what does the requirement means the delivery not available means ?
you can still congfigure the senario with material determination . in that you can set the requriement that if the material is not produced on the customer required date , the system shoulod propose alternatives
check the foroum for many threads to configure the material determination
Hope this helps
Thanks
akasha
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 57 | |
| 29 | |
| 21 | |
| 11 | |
| 4 | |
| 3 | |
| 2 | |
| 2 | |
| 2 | |
| 1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.