on ‎2009 Mar 21 6:39 AM
Hi,
My client have following scenario
he created one Sales order with material 'X' (MTO)
at the time of delivery my client is asking If materal 'X ' is not ready then system should give pop up
message where he will get list of materials which will replace to material 'X' & he will select
one material from that list.
my question is this scenario is possible?
if yes how to map it?
regards,
akshay
Request clarification before answering.
Akshay,
Material Determination process.
since you are cutsomising follow th path:
IMG --> SD --> BF --> Material Determination
1. Access sequuence is A001 - Material Entered
2. Condition Type is A001
3. Material determination procedure = A00001
4. Assign the procedure to your sales document type
5. Define subsitution reasons
Note: Against Substitution Reason 0004: Activate Warning indicator and under Output column = A
Front End:
Easy Access --> Logistics -->SD --> Master Data --> Products --> Material determination or Tcode VB11
In this screen Enter "MatEntered" = xxxx
Material = XXX1 enter unit of measurement and maintain proposed reason as 0004 - Autm material selection
Note: you have to mainatin the same reason at the top and in coulmn. Press enter. This is for single material.
If you want to add two more materials Choose the material and then click "Alternative materials" - ICON appearing at the top -left of your screen.
Here you can add the materials that you would like to replace with the original material then most important click or activate MRP indicator. this will help you.
Since you have activated MRP indicator, it wii serve your requirement
Note this activity will happen at sales order level not at delivery level
just check....
Regards
Sathya
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
If you maintain 'A", system will redetermine Product selection in deliveries but for 'B' it is only for sales orders
This link may also useful.
http://help.sap.com/saphelp_erp60_sp/helpdata/en/90/758534c960a134e10000009b38f83b/frameset.htm
Chidambaram
Hi,
Use material determination concept - reason 0004-
Chidambaram
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello,
For a MTO, the sales order is trigger for delivery date. based on your avilability check settings , the system will propose a possible date
what does the requirement means the delivery not available means ?
you can still congfigure the senario with material determination . in that you can set the requriement that if the material is not produced on the customer required date , the system shoulod propose alternatives
check the foroum for many threads to configure the material determination
Hope this helps
Thanks
akasha
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 57 | |
| 29 | |
| 21 | |
| 11 | |
| 4 | |
| 3 | |
| 2 | |
| 2 | |
| 2 | |
| 1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.