cancel
Showing results for 
Search instead for 
Did you mean: 
Subscribe

Hi,

Please tell me how the material master field sequence can be changed suppose we want accounting 1 & 2 in place of basic data 1 & 2. how is it possible please tell me.

Sanjeev

0 Likes
View Entire Topic
Former Member
0 Likes

Hi,

Based on material type/ind sector you can change the sequence of veiws of material master.

SPRO->LG->Material Master->Configuring the Material Master-->Assign Screen Sequences to User/Material Type/Transaction/Industry Sector.

Subrahmanyam