Please tell me how the material master field sequence can be changed suppose we want accounting 1 & 2 in place of basic data 1 & 2. how is it possible please tell me.
Sanjeev
Request clarification before answering.
Hi,
Based on material type/ind sector you can change the sequence of veiws of material master.
SPRO->LG->Material Master->Configuring the Material Master-->Assign Screen Sequences to User/Material Type/Transaction/Industry Sector.
Subrahmanyam