Hi,
Is it required to run MRP,for generating Exception message in Stock requirement List.
OR
Is it like something that MRP run is required for certain message (like '01') and certain meassage are genreated by system in MD04 like message '07'
If so for which message MRP run is required and for which it is not required? How system find these settings?
Thanks,
Lalit Phegade
Request clarification before answering.
In the OMD3 config pointed above, there will be an information icon next to Key. Click on that for each entry to see the Diagnosis (that specifies what causes this exception message) and System response (that specifies whether this is displayed only in MRP list or both in MRP and S/R list).
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear,
exception messages are generated by system to indicate the process exceptions...while running MRP, as per the customization settings you may get planned orders whose date is in past. Hence system will issue a EM for this so that planned can take appropriate action.
This is basically to inform planner that what are the issues associated after planning and needs his attention, and action by him will reduce the problem in future.
Some of the similar EM are grouped under a EM group
There are reports like MD06, MDLD which will give the list of materials according to EM groups so that planned can take action
Example is given below
Group -
Message -
Description
69 Recursive BOM components possible
1 02 New, and opening date in the past
05 Opening date in the past
2 03 New, and start date in the past
06 Start date in the past
63 Production start before order start
3 04 New, and finish date in the past
07 Finish date in the past
64 Production finish after order finish
4 01 Newly created order proposal
42 Order proposal has been changed
44 Order proposal re-exploded
46 Order proposal has been manually changed
61 Scheduling: Customizing inconsistent
62 Scheduling: Master data inconsistent
80 Reference to retail promotion
82 Item is blocked
5 50 No BOM exists
52 No BOM selected
53 No BOM explosion due to missing config.
54 No valid run schedule header
55 Phantom assembly not exploded
6 25 Excess stock
26 Excess in individual segment
40 Coverage not provided by master plan
50 Shortage in the planning time fence
57 Disc. matl partly replaced by follow-up
58 Uncovered reqmt after effective-out date
59 Receipt after effective-out date
70 Max. release qty - quota exceeded
96 Stock fallen below safety stock level
7 10 Bring process forward
15 Postpone process
20 Cancel process
30 Plan process according to schedule
8 98 Abnormal end of requirements planning
see link http://scn.sap.com/thread/848002
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Exception messages are generated during the planning run when a situation needs to be checked by the MRP controller. In these cases, the planning results usually need to be reprocessed manually.
In the MRP list, which reflects the result of the last planning run, more exception messages are set as the net requirements calculation is carried out automatically.
During generation of MRP list or the stock/requirements list. system will proposes the Exception message key and No
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 14 | |
| 13 | |
| 7 | |
| 6 | |
| 5 | |
| 4 | |
| 3 | |
| 2 | |
| 2 | |
| 1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.