sap_pp13
Active Contributor
Member since ‎11-21-2011

User Statistics

  • 517 Posts
  • 63 Solutions
  • 0 Kudos given
  • 145 Kudos received

User Activity

Planning as we know is never smooth and is always subjected to deviations. Options to smoothen the effects exist and in SAP they take up the forms of‘Quantity float’ to take care of variability in demand and/or production and‘Time float’ to take care...
In the documentSafety Stock and its Availability for Planning Purposes we discussed on the static safety stock feature usage along with availability aspects of the same during a planning run using MRP groups.This document will focus on the dynamic as...
A very very basic document to illustrate what purpose the Splitting Indicator serves in planning and how to infer the planning results during its usage.Starting point is Forecast-based planning which is on the basis of past material consumption and t...
Safety stock, the necessary or unavoidable evil as it is sometimes called, exists as a ‘Quantity Float’ in planning to take care of variabilities both in demand and supply. Safety stock is an integral part of the Net Requirements Calculation in MR...
This blog is an attempt to share the individual 'understandings' and 'expectations' related to the emerging trends in SAP Forecasting/Supply Optimization vis-a-vis Demand Sensing and Inventory & Service Level Optimization currently projected with SAP...