Hi,When we search a quick search in portal with all object, system is not giving any data for the material whereas system is giving data for the change no and Document.Some where the material serach is Broken.Could you let me know how to bring back ...
SERIAL NUMBER TRACEABILITY In case of any complaint or recall issue from the customer, then we need to track what are all the materials used to manufacture the lot and trace the same.In Batch management, we can track the raw material used for product...
HI, Currently I am Working in Ecc 6 EnHP4, I have maintained all the setting for shift wise confirmation, In co15 its working fine, When I Try to do in CO11n, Its not Coming, while checking In single screen entry, in default tab, Shift...
Hi,1) I have created a equipment PRT and assigned the Measuring Point with measuring point is counter in PRT view of equipment and assigned the characteristic in the measuring point.2) Assign the Equipment PRT for particular operation and given th...
Hi, I have Created the Infostructure in MC21, The status says the new, when I go to set/ get parameter for Infostructure( MC7F). The created Infostructure Is Not In The List, I have checked in Mc23 ,The created Infostructure is available, please ...
Hi,could you please check in BOM usage whether you have restricted the Enginnering/designI have tested in my system i can aable to add the component with Enginnering/design
In OS20Production entry should be optionalIN OS21 Remove the default value for the Production for your BOM usageAnd then in BOMFor the particular item don't set the production tick and the try to do the planning, I haven't tested, But I feel it wil...