Hi, Experts,
We have Two Co. Codes While Customizing one Document Type Both The Co. Codes requirement is very similar then we have assigned No. Ranges via FBL1N and we posted documents through both co. codes .Later one Co. Code Requirements are differ than other Co. Code requirements . Here both the Co. Codes want same document type is it possible if yes what is the procedure . is there any Co. Code Independent Document Types. Please let me know .Points will be assigned .
With best regards
Sarath babu
Request clarification before answering.
Hi,
Document types are defined at client level. there is now assignment like document type to company code. But for every document there should be number range that is defined under company code only.
so document type is one whereas number ranges are defined at company code level.
Hope this is clear, if yes assign points
Regards,
Sankar
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 13 | |
| 12 | |
| 6 | |
| 6 | |
| 6 | |
| 4 | |
| 3 | |
| 2 | |
| 2 | |
| 1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.