Hi, Experts,
We have Two Co. Codes While Customizing one Document Type Both The Co. Codes requirement is very similar then we have assigned No. Ranges via FBL1N and we posted documents through both co. codes .Later one Co. Code Requirements are differ than other Co. Code requirements . Here both the Co. Codes want same document type is it possible if yes what is the procedure . is there any Co. Code Independent Document Types. Please let me know .Points will be assigned .
With best regards
Sarath babu
Request clarification before answering.
hi Sarath,
Document types are customized on client level, that means the settings in tcode OBA7 will be the same for each company code. If you need something differently, than you can set up validations and substitutions.
Number ranges are set up on company code level, so you can have different number ranges for the same document type but different company codes.
hope this helps
ec
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 29 | |
| 14 | |
| 7 | |
| 4 | |
| 4 | |
| 3 | |
| 2 | |
| 2 | |
| 2 | |
| 1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.