‎2009 Aug 17 8:14 PM
Hi,
I am creating a material idoc using Change Pointer concept, but I need to create an idoc with all material details( full idoc).
Currently idoc is generated only with segments whose data is changed.
Thanks,
Aaksah
‎2009 Aug 17 8:18 PM
‎2009 Aug 17 8:18 PM
‎2009 Aug 18 5:34 AM
‎2009 Aug 18 6:37 AM
Hello Aakash,
You need to activate change pointer for all the fields of material master. Use transaction BD52 and provide message type for material mater then it will display fall the fields. Select the required fields for with check box to active the change pointer on them.
Hope this helps!
Thanks,
Augustin.