Recent Activity

    Task 4 - Implement Criticality feature and create an Object page

    This is the last task of the August Developer Challenge on ABAP Core Data Services. The responses we have seen so far is excellent and appreciate each one of you in taking time to complete the challenge. We have seen some good conversations about the...

    Task 1 - Create CDS View Entity ( August Developer Challenge )

    First of all, thanks for the overwhelming response to the ABAP Developer Challenge. Kudos to everyone who took time out of their busy schedule and finished the pre-requisite – Task 0 last week.Now let us dive right into the challenge.Task 1 - In this...

    sheenamk by Developer Advocate
    • 94647 Views
    • 212 Comments
    • 39 Likes

    Inbound IDOC

    HiWe are receiving an Inbound IDOC and the data is getting updated into a custom table.When single record is there its working fine when I receive multiple records then the last record is getting updated ,Please let me know how to update all the reco...

    Resolved! Accepted Solution

    CURRENCY

    Good Day Folks ...My application builds a DDIC Table dynamically. All works until I attempted a CURR Type.I understand I need to provide a reference table and reference field and I kinda get the idea how it's done via SE11, but could someone list som...

    Resolved! Accepted Solution

    SELECT from table

    Hi Friends , I have the following SELECT to get data from a ztable . I checked the table for the same criteria and there is data . Any idea why it is returning with SY-SUBRC = 4 ? S_DISP and S_DISP1 are the 2 diff selection criteria on the same selec...

    HR

    Hi guyz,my requirement is..my program should calculate the total number of hours the employee is absent with in the given period..for eg : 1-03-2008 to 31-03-2008In the table iam having begda = 28.02.2008 endda = 03.0...

    Resolved! Accepted Solution

    flat file -bdc

    Hi,I have to prepare a flat file for an bdc which is already existing in Production.I had just prepared one based on the internal table fields in the program,bt it is not working.Do anyone have an idea on how to prepare based on an existing program?K...

    kiran_k8 by Active Contributor
    • 617 Views
    • 2 Comments
    • 0 Likes
    Resolved! Accepted Solution

    Unlike ABAP itabs, ECC 5+ Shared Memory Objects DON"T swap out, right?

    In this thread here:CharlesF confirmed my suspicion that program-internal ABAP itabs DO swap out when the app server scheduler swaps out the code itself.This is a great, great argument for using the new Shared Memory Objects (SMOs) available in ECC 5...

    Resolved! Accepted Solution

    new to abap

    hi iam new to abap and i need to know how i can extract the po number from ekko and item no,item description and po quantity from ekpo using posting date as the selection criteria into an internal table and then display the content.

    Resolved! Accepted Solution

    Using Status managemet (TJ20, TJ30) in custommer developement

    Hi everybody, I'd like to use the status framework for custommer developement. There are the tables TJ20( Statust schema) and TJ30(User status) in standard. I'd like to defime my Z-status schema and by standard f.m. or class to check, whethever is po...

    Resolved! Accepted Solution

    Copying Control: Billing Document to Sales Document (PO# not being copied)

    For Copying Control: Billing Document to Sales Document we are using standard SAP routine 103. The issue we are having is that the PO # is not being copied over.I looked at the source code and it does a MOVE-CORRESPONDING from CVBRK to VBKD.The fiel...

    Labels in this area

    Explore this Area