on 2014 Mar 12 1:00 PM
I created a replication job in Workbench 4.1 to migrate 16 tables - ODBC sources (for AS400) and Microsoft SQL Server targets within a single replication group. I can select Type to either Parallel or Sequential for the replication group:
I set Type to Parallel and when executing, I observe that 8 of the 16 tables begin processing and as each completes another of the remaining begins so there are always 8 tables being processed until there are no longer tables to process.
If I test with two separate replication jobs each with 8 of the 16 tables with Parallel set and execute at the same time, both jobs load 8 tables in parallel so that 16 are being loaded at once.
I would like to understand how the number of source/target replications running in parallel within a Workbench replication job is determined and/or set (in my case, 8). Is that within the tool at all or is it strictly from the database?
Request clarification before answering.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 5 | |
| 5 | |
| 4 | |
| 4 | |
| 2 | |
| 2 | |
| 2 | |
| 2 | |
| 2 | |
| 2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.