Hi all ! i´m working in a process integration excersise scenario where I want to implement some basic connection with ECC and a third party system, the thing is that when I want to assign an interface to the model I don´t see any of them.

So I check the SLD configuration but I see the software development component assigned to ECC system.

And the NWDS is not showing the software component too.

I´m working in a process orchestration system (Only Java) and I´m new in this thing but I want to learn at least the basics, any help will be appreciated.

Thanks !

0 Likes
View Entire Topic
Former Member
0 Likes

Hello,

Go to ESR and import SWC from SLD.

Edited - I think, i misread ur question so u have already created created inbound/outbound SI under desired SWCV?

Thanks

Amit Srivastava

Former Member
0 Likes

Hi Amit, i'm following the SAP PRESS book PI practical exercise or something like that, I begin with creating a product, then a software Component and set this as installed software in the ECC sld config, then I import to the ESR an ECC WSDL and then I create manually a service interface assigning the data types the import of the wsdl generates.

Then I guessed that I could begin with a flow or almost set one of the systems and the previous interface generated in the ESR, but when I try to assign the published interface in the ESR to the flow and to the ECC side I didnt find any interface yet...

Former Member
0 Likes

Hello,

I hope the Service interface which you are trying to assign ECC receiver system is of type "Inbound" pattern?

Thanks

Amit Srivastava