on ‎2015 Jan 20 10:01 AM
Hello
What's the process to migrate a splitted MCOD BW Instance (java stack) to SAP Hana. I see lot of threads with similar questions. Can someone answer this? No sidecar solution please ;-). We want to replace the running "AnyDB"
There are no DMO/SUM process for such things. Yes, a lot of logic allready integrated in BW7.40 in the abap stack, but we're using Java Stack also for BI Portal, Web BEX, Xcelsius ...
Thanks for any hints.
Kr,
Florian
Request clarification before answering.
Hi Florian
Try to avoid MTC with HAANA and use MCOD instead.
In most of the cases a new Install of the BI-JAVA is easier than Export/Import/Upgrade.
See the following Document for Details -
The Informations didn´t changed for 7.40/7.50 for the Implementation. for more Informations see the SCN Page
SAP BW Application Lifecycle Management (ALM)
Best Regards Roland
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Roland
Thanks for the update. We've upgraded our productive BI (Abap&J2EE) to HANA (750 SP2, MCOD). I've made some scripts which changed all config xml files in j2ee :-)...., because I've also changed the 2 AS to the SAP HANA system :-).
The BW System is running very stable on HANA. Because the HW requirement is very restrictive (Power on Linux), the CPU utilisation is lower then 10% ;-).....
Best Regards
Florian
| User | Count |
|---|---|
| 8 | |
| 5 | |
| 4 | |
| 3 | |
| 3 | |
| 2 | |
| 2 | |
| 2 | |
| 2 | |
| 2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.