on ‎2015 Jan 20 10:01 AM
Hello
What's the process to migrate a splitted MCOD BW Instance (java stack) to SAP Hana. I see lot of threads with similar questions. Can someone answer this? No sidecar solution please ;-). We want to replace the running "AnyDB"
There are no DMO/SUM process for such things. Yes, a lot of logic allready integrated in BW7.40 in the abap stack, but we're using Java Stack also for BI Portal, Web BEX, Xcelsius ...
Thanks for any hints.
Kr,
Florian
Request clarification before answering.
Hi,
with 7.40 used on HANA, you have all option available as you would use a traditional DB
For Expample you can use the MCOD (multiple components, one database) to instal BI-JAVA 7.40 along with the ABAP instance even on the HANA appliance.
See - New Installation of SAP BI JAVA 7.30 - Options, Connectivity and Security
which also works for 7.40.
Screenshot taken from Presentation - TechEd 2014 Las Vegas/Berlin - ITM206
Best Regards Roland
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Roland
Very useful Information, thanks a lot!. I hope that we can start soon our HANA POC. We're trying to get into the PowerVM Rampup for HANA.
As always, you're the best. I think 6 years ago your documentation about new NW BW 7.0 Installation guide was a dream!
Best Regards from Zurich,
Florian
| User | Count |
|---|---|
| 8 | |
| 5 | |
| 4 | |
| 3 | |
| 3 | |
| 2 | |
| 2 | |
| 2 | |
| 2 | |
| 2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.