on ‎2009 Mar 30 7:56 AM
Dear All,
We are pulling data into purchasing info cube 0PUR_C01 through the datasources 2LIS_02_ITM and 2LIS_02_SCL. We need to do a re-init of the data starting from 1st march 2009. When we do this via the info pack the systems returns a message "no data available for selection".
I am not sure whether its necessary to fill the setup tables prior to the init run and if so can anyone let me know whether the setup table can be filled from the 1st of march only.
Request clarification before answering.
you can do setup tables based upon any date say 01.03.2009. (X)
that means if do filling of the setup tables based on X date then the data which is there in the setup tables will be the records what ever posted up to that X date. It doesnt mean that X date should be there in the extractor field which you are trying to filter in the IP.
I hope you got the differenec between setup tabels filling date and IP selection date.
These two entirely different.... the second one speaks abt the data in the extractor and where as first speaks about the time stamp.
Edited by: shanthi bhaskar on Mar 30, 2009 3:06 PM
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 9 | |
| 5 | |
| 4 | |
| 4 | |
| 4 | |
| 3 | |
| 3 | |
| 2 | |
| 2 | |
| 2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.