on 2009 Aug 05 7:04 AM
Hi,
We are trying to use solution Manager for managing our IT projects - specifically for SAP projects.
We browsed through the existing functionalities that are available and are not able to get info on the following:
___Project Admin tab for Roadmaps :_ __ In the transaction RMMAIN, we are able to define the scope of the activities at each phase and assign team members and track the status of the activity / task.
However we do not have the tab for tracking the planned start date / end date and the actual start / end dates. Similar is the case for efforts.
So not sure how to track these?
Integration of Roadmaps and Blueprints : Once we have defined the project and assigned the Roadmap, we have all the activities that need to be tracked. In addition in transaction SOLAR01 / SOLAR02, we can define the scope and configurations which in itself are a kind of sub projects to be embedded withing the Blueprint and realization phases respectively of the main Projetc Plan.
How to link these Blueprint specific plan and the realization related plan to the main project plan created out of the Roadmap chosen and to track them as one single project?
Synchronization wih ms project : I see only the option to download the plan as an mpp file. But is there any option to upload mpp as well so that the project can be tracked using mpp and synchronized with Solution manager at frequent intervals?
Your answers would definitely be helping us a lot and would be greatly appreciated.
thanks in advance.
regards,
suresh velan
Request clarification before answering.
Hi Suresh Velan, please go to the following link, http://service.sap.com/rkt, select Solution Manager (Select your Solman Version), then check the differents Learning Maps Content (there are a lot of tutorials or pdf documents (extension .sim, remember if you dont have the SAP tutor viewer, you must download first)
Regards,
Ignacio.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
hi,
thanks for the info.
I have gone through most of the documents pertaining to these subject areas.
unfortunately could not find teh answers that I was looking out for.
Still not able to conclude whether these features are possible - and i will be surprised if not as they should be something very basic for project management.
And if yes, are there any specific configurations / BC sets to be activated to get these features?
thanks and regards,
Suresh velan
Hi, i understand what you said, please check the following link
https://websmp210.sap-ag.de/~sapdownload/011000358700002006042008E/HowTo_Impl_Bus_Proc.pdf
(Configuration Guide).
Regards,
Ignacio.
| User | Count |
|---|---|
| 15 | |
| 9 | |
| 6 | |
| 4 | |
| 4 | |
| 4 | |
| 3 | |
| 2 | |
| 2 | |
| 2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.