We've just copied the BW Production system onto a new server (Test BW).
The BW Production is pointing to Production ECC6.
We're have created a new RFC in the Test BW, which point to Test ECC system.
We have also perform the source system conversion via BDLS.
In RSA1 ->Source System, I can see name of the source system has been changed to Test ECC6.
However, when I right click on Source System ->Connection Parameter, I can see that
the Source System is still linked to the old RFC which is pointing to the Production ECC6.
How can I change this RFC so that it is pointing to the new RFC that we just created?
Please help, thank you.
Request clarification before answering.
no answer
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Ananda,
thats not an error. even we got the same message and after we deleted and created the connection again it worked fine.The problem is like I says, if we delete the Source System, all the Datasource, InfoSource etc of the existing data modelling will be gone correct? (This is the scary thing that I dont dare to try as I am not sure...)
So if I delete it and re-create the source system, then perform Activate and Replicate, will it link back again?
Is this what we should be doing?
Please advise, thank you.
Edited by: lynn on Mar 11, 2010 1:58 AM
| User | Count |
|---|---|
| 5 | |
| 4 | |
| 4 | |
| 2 | |
| 2 | |
| 2 | |
| 2 | |
| 2 | |
| 1 | |
| 1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.