Dear All,
I have a issue.
We have the BW system BWD.
we have the source system with the name ECQ300. Recently, system copy has been done by the Basis.
and now we have the new source system with the name "SAPECQ300".
They deleted the RFC connection from old system "ECQ300" and created new connection to "SAPECQ300".
Basis team has done all the necessary tasks and the RFC connection to "SAPECQ300" is also working fine.
hence we have only left with the new source system "SAPECQ300".
My problem here is,
We have all the existing data flows based on the old source system name i.e "ECQ300". since we have connection only to new Source system now. How to replace the existing assigned Source system (ECQ300) to the new source system (SAPECQ300) ??
I have read many documents on this.. but no proper clue. could you please guide me how to handle this..???
Thank you,
Regards,
Hema Tulasi.
Request clarification before answering.
Hi ,
Just check if the source system assignment has happened in RSA1-> Source system-> Tools->Assignment of Sourcesystem to source system ID
Create a new id with reference to your new system.
This should solve the issue
Prathish
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 5 | |
| 4 | |
| 4 | |
| 3 | |
| 2 | |
| 2 | |
| 2 | |
| 2 | |
| 2 | |
| 2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.