Dear All,
I have a issue.
We have the BW system BWD.
we have the source system with the name ECQ300. Recently, system copy has been done by the Basis.
and now we have the new source system with the name "SAPECQ300".
They deleted the RFC connection from old system "ECQ300" and created new connection to "SAPECQ300".
Basis team has done all the necessary tasks and the RFC connection to "SAPECQ300" is also working fine.
hence we have only left with the new source system "SAPECQ300".
My problem here is,
We have all the existing data flows based on the old source system name i.e "ECQ300". since we have connection only to new Source system now. How to replace the existing assigned Source system (ECQ300) to the new source system (SAPECQ300) ??
I have read many documents on this.. but no proper clue. could you please guide me how to handle this..???
Thank you,
Regards,
Hema Tulasi.
Request clarification before answering.
Hi Hema,
BDLS is the only option in this case.
The old system will be ECQ300 and the new name will be SAPECQ300.
This will replace the old name with the new logical system throughout.
Regards,
Sonal.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 5 | |
| 4 | |
| 4 | |
| 3 | |
| 2 | |
| 2 | |
| 2 | |
| 2 | |
| 2 | |
| 2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.