cancel
Showing results for 
Search instead for 
Did you mean: 
Subscribe

Dear All,

I have a issue.

We have the BW system BWD.

we have the source system with the name ECQ300. Recently, system copy has been done by the Basis.

and now we have the new source system with the name "SAPECQ300".

They deleted the RFC connection from old system "ECQ300" and created new connection to "SAPECQ300".

Basis team has done all the necessary tasks and the RFC connection to "SAPECQ300" is also working fine.

hence we have only left with the new source system "SAPECQ300".


My problem here is,

We have all the existing data flows based on the old source system name i.e "ECQ300". since we have connection only to new Source system now. How to replace the existing assigned Source system (ECQ300) to the new source system (SAPECQ300) ??

I have read many documents on this.. but no proper clue. could you please guide me how to handle this..???

Thank you,

Regards,

Hema Tulasi.

0 Likes
View Entire Topic
Former Member
0 Likes

Hi Hema,

We also faced the same issue recently. There is no way now, the mapping of the logical system and the datasources are changed by the BASIS team using the BDLS  T code and  this is strictly done by the BASIS team.

The only thing that can be done now is to create datasources mapped to the new source system manually. Also check if the datasources have been correctly copied in the ECC system itself.

Regards,

Saurabh