Dear All,

I have a issue.

We have the BW system BWD.

we have the source system with the name ECQ300. Recently, system copy has been done by the Basis.

and now we have the new source system with the name "SAPECQ300".

They deleted the RFC connection from old system "ECQ300" and created new connection to "SAPECQ300".

Basis team has done all the necessary tasks and the RFC connection to "SAPECQ300" is also working fine.

hence we have only left with the new source system "SAPECQ300".


My problem here is,

We have all the existing data flows based on the old source system name i.e "ECQ300". since we have connection only to new Source system now. How to replace the existing assigned Source system (ECQ300) to the new source system (SAPECQ300) ??

I have read many documents on this.. but no proper clue. could you please guide me how to handle this..???

Thank you,

Regards,

Hema Tulasi.

0 Likes
View Entire Topic
RamanKorrapati
Active Contributor
0 Likes

Hi Hema,

Most of the activities need to taken care by basis people. please check below note.

http://www.stechno.net/sap-notes.html?view=sapnote&id=325470

Thanks

Former Member
0 Likes

Hi Raman,

yes, I understand.

Can we do anything from our BW system to fix this as the connecting is working fine!!!??

Regards,

Hema

RamanKorrapati
Active Contributor
0 Likes

Hi Hema,

At BW side nothing is there do, as my guess basis may be performed all required conectivity kind activities.Below pdf might be useful to check bw connectivity.

http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/70a7b233-8be5-2c10-4190-aed723af5...

If every things works fine then start loading/executing(in Dev) each data flow which you were designed as per business needs. if you won't face any source sysem(changed version) related kind errors that would be perfect.

Thanks