on ‎2014 Aug 22 12:39 PM
Hi,
I am running a local client copy using 5 parallel processes.
Suddenly i can see after sometime the parallel processes reduced to 2 and the client copy is very slow now.
Is it recommended to lock the source client before client copy for better performance and any other prerequisites need to be followed?
Request clarification before answering.
Hi
there are two reason why you parallel work process are reduced to two .
1. generally Client copy runs in background and it schedule the job of Class C while running the same if any other background job with higher class needs to be run SAP will deallocate your work process and give it to other Work process
2. solution to this is as followes
- try to schedule the same in night
- in night operation mode increase the value of background process and reduce the dialogue work process if it suits your project requirement.
- have adequate space in table spaces
3. and there is no need to lock Source client .
all the best
Regards
Dishant pathak
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 8 | |
| 5 | |
| 4 | |
| 4 | |
| 3 | |
| 3 | |
| 2 | |
| 2 | |
| 2 | |
| 2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.