hi all,
I'm facing problem with Caller 09 error every day when info package is executed in process chain. I just use repeat option in process chain for executing the info package step, I'm doing this for step every day. Please suggest me how to resolve these error permanently. Error massage is follows:
And also I tried :
But same problem for next day. Please give some solutions to resolve this error permanently
Request clarification before answering.
HI,
check the TRFC issues in SM59. push to manually using execute button.
after running the info package check the jobs is generated or not in ECC system.
check the SM37 job logs in ECC with BIREQU.
if not job generated in ECC check with the basis team have table space issue.
Thanks,
Phani.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 8 | |
| 5 | |
| 4 | |
| 4 | |
| 3 | |
| 3 | |
| 2 | |
| 2 | |
| 2 | |
| 2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.