on ‎2021 Mar 11 6:59 PM
Dear Friends,
I have requirement to move SAP ERP ,BW , HR applications to different datacenters. Source and target have different versions of Oracle , Windows. I would request your suggestions on migration methodology. Whether we can use backup / restore or need to follow SWPM export / import procedure.
Source landscape :
OS : Windows 2012
DB : Oracle 12.2
Target landscape
OS : Windows 2019
DB : Oracle 19C
Thanks,
Ramesh
Request clarification before answering.
Ramesh If you want to save downtime then consider upgrading the DB to 19c on the source system before you prepare to move the systems to the new DC. If backup and restore is possible between the two DC's then you could follow that. You could get the target system installed already and then take a full backup of the source system and restore it on the target host and enable log shipping from the old DC to the new DC. On the final day you will just apply all the logs and open the database. This way you will save a lot of time.
RB
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 5 | |
| 5 | |
| 4 | |
| 4 | |
| 3 | |
| 3 | |
| 3 | |
| 2 | |
| 2 | |
| 2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.