Hi guys,
Am investigating on how we can possibly integrate CTS for transporting of our non-ABAP objects. In our landscape - our QA environment consists of the Portal that has the Java Stack only and ERP that has the ABAP Stack only. Our production has the same landscape. And for CTS+ to function, it requires both Java and ABAP stack. Thus, given our landscape, is it possible to integrate CTS+? And if so, are there any complications?
Thanks,
ZHenmin
Edited by: zhenmin wang on Apr 8, 2008 9:57 AM
Request clarification before answering.
Single stack system is still possible to implement CTS+ but it doesn't allow the synchronization of transporting ABAP and non-ABAP objects, which is a big limitation.
I've checked with my tech arch guys, and other than Portal and ERP systems (both of which are single stack), we have BI system which has a dual stack installation. I've always assumed that for CTS+ to work, only either Portal or ERP systems can be dual stack since the ABAP and non-ABAP objects are from those 2 systems. Is there any problem with using BI system for our CTS+?
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 5 | |
| 4 | |
| 4 | |
| 3 | |
| 2 | |
| 2 | |
| 2 | |
| 2 | |
| 2 | |
| 2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.