on ‎2014 Jun 18 1:40 AM
Hi,
We need to perform the client export of PRD (300 client) system and import in QAS (300 client) i.e. quality server.
I have performed the Client export of PRD (300 client) server, which takes 4 hours and creates following two requests..
RT00025 (Client specific) = 9 GB
RX00025 (Texts) = 90 MB
Database is ORACLE on windows server 2008 R2.
Last time when we perform the client export and import procedure, that time client specific request (RT00023) is of 3 GB and it has taken 2 days to complete the client import procedure. Another thing I have seen that, there are huge redo log files created in ORAARCH folder near about 80 GB redo log files during this client import.
So please advise me on following points..
Thanks and regards,
Swapnil.
Request clarification before answering.
Hi,
As per my knowledge i would suggest you to opt SAP_CUST ( Customizing) as SAP_ALL export would be huge in size and not always possible as there are limitations.
(Best method is to use system copy procedures for such time consuming jobs.)
Regards,
Gaurav
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 8 | |
| 5 | |
| 5 | |
| 4 | |
| 4 | |
| 3 | |
| 2 | |
| 2 | |
| 2 | |
| 2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.