on ‎2009 May 15 10:42 AM
Hi,
We need to do a client :300 export from PRD system and import it to Quality: 206 client.
The size of the database in PRD system is around 90 GB and database is Oracle 10.2.0; windows 2003 OS.
Hence please advise on the following.
1. How much free space we require in PRD system for client export, if the whole database size is
90 GB?
2. Can u plz. list the steps for client import and post import activities.
Thanks & Regards
DVRK
Request clarification before answering.
Hi,
You can perform the client export using the Tcode SCC8. Once the export is done in the PRD system, you can see 2-3 number of transport request created based on the profile selection by you.
FTP these files from PRD to QAS system and import these transport requests in QAS system.
When Import of these requests are successful, please perform the post processing steps using Tcode SCC7.
For more details, please refer to the below link.
http://help.sap.com/saphelp_sm32/helpdata/en/69/c24c4e4ba111d189750000e8322d00/frameset.htm
With Regards,
Saurabh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
We have exported the client successfully and two cofiles and two data files( of around 4 GB size) have been generated.
We copied them into the trans directory of the target system client and trying to import them
with STMS_IMPORT.
The import started and running for a very long time. The logs are showing as " running main import".
The tp log is also showing it as " START MAIN IMPORT " phase.
How to check whether the actual import is happening or nothing is running ? In SM50 sometimes workprocesses are completely waiting, sometimes getting occupied. We have locked all the users also while importing.
Please advise.
Thanks,
DVRK
| User | Count |
|---|---|
| 6 | |
| 6 | |
| 4 | |
| 4 | |
| 3 | |
| 3 | |
| 2 | |
| 2 | |
| 2 | |
| 2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.