Introduction


This blog post describes the way to work with processes in SAP Clod ALM. The blog post implies following pre-requisites:

  • SAP Cloud ALM project is created

  • Initial scope of the project as solution scenario "SAP Best Practices for SAP S/4HANA Cloud" is defined:



 

Start of work


Once the initial set-up of Project in SAP Cloud ALM is done and solution scenario(s) is defined, we get possibility to work with processes. The processes in fact are Scope Items to be activated/customized in Central Business Configuration and S/4HANA Cloud.

We have to start working with processes from the project launchpad:


Alternatively we can jump to the processes from the left panel:


After clicking on the left panel icon or number of processes on the launchpad we go to the Processes app and see Solution Process Scope screen:


We need to click there Edit Scope and filter then Scope Items (Processes) by country of the project:


Then we can mark Scope Items (Processes), applicable for the project and End scoping. Alternatively we can add new solution scenario(s) via Manage Scopes button:


Once this activity is finished, we can move to work with each Process (Scope item) separately.

Working with Solution Process


Let´s check out, what is available for a separate Solution Process. We will take 53M as an example and click on it:


On the left hand side by default we see Solution Value Flow, and on the right various details of the process:


We can also jump from the right area to set-up instructions and test scripts, which are located at SAP Best Practices Explorer:


Solution process flow gives us detailed information on role of the Process (Scope item) in the overall near-located data flows:


And the detailed area on the right gives us possibility to assign:

  • requirements - expectations from business that need to be fulfilled

  • user stories - definitions of requirements from user perspective

  • project tasks - entities for team collaborations and clarifications

  • note - optional additional information


From the beginning, no items for assignment will be available. We can create them from the top right corner:



Setting-up the process


As far as we use for the example Solution Process 53M "ABAP Core Data Services Extraction for SAP Data Intelligence", the overall Process set-up can look as following:

  • Requirement to connect SAP Data Intelligence system via capabilities of Scope item 53M:

  • User story, which describes applicability of this requirement:





  • Task to implement the related to the scope item requirements:



The final result could look like this:



Conclusion


Such a detailed set-up of Solution Process will help the project team and responsible person in particular to implement the Scope item thoroughly and track all the related tasks/processes flows.