The ability to replicate employees' planned hours from Employee Central (EC) to Employee Central Payroll (ECP) has been the one piece of functionality i've wanted the most since the introduction of ECP. Having the employee's working time replicate to ECP in the form of substitutions (IT2003) along with public holiday class information from EC means we no longer have to duplicate work schedule rules or holiday calendars between the systems, the yearly task of generating out work schedules after updating holiday calendars in ECP can be retired. 

The following is a quick start guide to configuring planned working time replication between EC & ECP. The following reference screenshots are taken from an Australian implementation example.

Shout out to Pravin Naiker also from SAP who helped put this together.

 

Agenda


Configuration Steps in Employee Central

    • User Permissions

 

    • Planned Working Time Replication Period

 

    • Data Replication Configuration – PWT



Configuration Steps in Employee Central Payroll

    • Create Dummy Work Schedule

 

    • Disable Collision Checks

 

    • PTP Mapping

        • Map Holiday Class

        • Map Substitution Type

        • Map Work Schedule Rule




Replication Job & Scheduling

Replication Extensibility

Things to Note

 

Configuration Steps in Employee Central

 

User Permissions


Ensure that the below permissions are granted to your User or Role before proceeding with Manage Data Settings


 




Planned Working Time Replication Period


This setting allows you to set a Start Date and the period length (mandatory) for which substitutions will be sent to ECP.

The End Date is calculated based on the number of days entered. Please note that it is recommended that you select “Yes” for “Update Automatically” field as this will enable the overnight job to increment the Start & End Date by a single day and in doing so create a replication Proxy.

Note: Period length in days: Don't just consider the length of your pay period cycle, if you use working days in month end accruals calculations, use advance pay functionality the number of days you need substitutions replicated for could be at least 30 days, possibly to the maximum of 60 days.


 




Planned Working Time as a Replication Object


This setting is similar to creating any other Data Replication object (e.g. Absences).

Only difference being the Planned Replication Time object created in the last step needs to be specified here.


Note that the Earliest Selection Date plays an important role when the replication Proxy is created. See the conditions around replication and Earliest Selection Date and Planned Working Time Replication Period Start Date below:


 




Configuration Steps in Employee Central Payroll

 

Create Dummy Work Schedule


Using a 24x7 work schedule as your default needs to be reviewed against the customer requirements, there is nothing stopping you assigning a 5 day x 8 hour work schedule as your default.

Daily Work Schedule



    • Create a 24 Hour Daily Work Schedule

 

    • And one for the OFF days.




 



Period Work Schedule


Create a 24X7 Period Work Schedule


For more details refer to SAP Notes:

Note 2914265

Note 2906872

 




Enable ”Holiday Class” field on IT2003


Because the public holiday class field on the substitution record will be populated by replication from EC, you may need to enable the Holiday Class field to be visible.


Review Customising table view T588M.

 




PTP Mapping

 

Map Holiday Class


Delivered as standard.

The Holiday Class field (FTKLA) of Infotype 2003 is populated as part of standard PWT replication. The assumption here being no Public Holiday calendars are maintained in ECP. For the above scenario please leave the “HOLIDAY_CLASS” mapping as is.


If for some reason you are still maintaining Public Holiday Calendars in ECP then please refer to the steps outlined under section “Updating the mapping for the holiday class” in SAP Note 2914265

Map Substitution Type


As a prerequisite please ensure that your Substitution type is configured against the appropriate Personnel Area Subarea grouping.


Finally in the PTP Mapping table T777SFEC_CVMAPC setup mapping as per below:



Map Work Schedule Rule


There are two mapping entries that need to be maintained in the mapping table T777SFEC_CVMAPC

A) Work Schedule Rule


B) FREE Work Schedule Rule


To cater for the following scenario: Your employee has a day off that is a planned working time of 0 hours in Employee Central. To replicate it to IT2003, you need to create a dummy daily work schedule FREE in Employee Central Payroll.




Replication Job


With this new replication object comes a new replication program to be scheduled

RP_HRSFEC_PTP_PLAN_WORK_TIME

To avoid issues with multiple replication jobs running at the same time, create a single job with 4 steps (in this example) to sequentially execute each PTP replication job.


 




Replication Extensibility


By replicating substitutions you remove the need to configure Work Schedules in ECP which by utilising a single dummy schedule, this removes a lot of duplication.

However you can run into data issues during master data replication for the employee's infotype IT0007 Planned Working Time and IT0008 Basic Pay, with a number of fields which rely on the work schedule information.

    • Employment percentage EMPCT on IT0007

 

    • Cap Utilisation DIVG & Hours per Period BSGRD on IT0008.



One option is to use BAdi's to maintain the correct values for these fields which are available in PTP replication.

A second option is to use 3 custom_double fields in EC and via extensibility update the infotype fields without using a BAdi.


 




Things to Note


Below is a scenario that came up at a customer which caused a Substitution Collisions

The employee recently changed the legal entity (from company code 3000 to 4000) and there where still DataReplicationProxy records in the EC system created before the legal entity change (referring to the old legal entity) as well as DataReplicationProxy records created after the legal entity change (referring to the new legal entity).

Since both legal entities are mapped to the same personnel number in the ECP system, the replication process tries to create more than one IT2003 record for one day which results in the collision error.

Workaround:

Go to Manage Data and find all DataReplicationProxy records related to planned working time of employee. Change the legal entity at the DataReplicationProxy record so at the end all DataReplicationProxy records refer to one legal entity (company code 3000 or 4000). It does not matter if you choose 3000 or 4000 because both legal entities are mapped to the same personnel number in the ECP system. This should solve the collision error.

To avoid this issue in the future make sure that all pending IT2003 records are replicated successfully to the ECP system (i.e. there are no DataReplicationProxy records for an employee) before you start to change the legal entity of that employee.

 

Documentation

Implementation Guide for Planned Working Time, Under ECP Support page under ‘Implement’

https://help.sap.com/viewer/9bc433ddd056413ab5202588d26d69d4/2011/en-US/045b072df0894f6cb5955f94dde1...

Defining a Dummy Work Schedule with an Actual Holiday Calendar for PWT Replication

    • Note 2914265



Defining a Dummy Work Schedule for PWT Replication

    • Note 2906872



Substitutions

    • Note 2914265

 

    • Note 1596996



PWT Replication and Average Working Hours in Infotype 0007 - BAdI-based Solution

    • Note 2925305



 

Cheers,

Brad

 

4 Comments
Volker_Ruof
Product and Topic Expert
Product and Topic Expert
Nice and useful blog - thanks Brad !
GirieshCM
Active Participant
0 Kudos
Hi Brad,

Thank you for the wonderful blog. I am trying to implement this for a project but I got struck with the holiday class field enabled. When I check the technical details of the IT 2003, it says the program name is MP200000 and screen 2100 and when I try to enable the field FTKLA via V_T588M, the field is not available. Can you please help me how did you managed to get the field. Do I have Issue in 608 SP 83 level.

 

With Regards,
GM
former_member35960
Discoverer
0 Kudos
Hi Brad,

Do we have a similar option for Employee time replication to S4H IT2003 ??

Please suggest.

Thank you.

 

 
ktm
Discoverer
0 Kudos
Hi Srini,

Did you find a way to do this planned working time replication to S4H?

Very interested to know if anyone has achieved this for replication to ECC also?  We have everything set up and absences are replicating via the data replication proxy object, but Planned Working Time hours are missing on the records with Replication Content Type Planned Working Time (we have both Planned Working time/ substitutions and Absences configured), though the dates are there.

Hoping someone else has experience that can assist.