Hi
If we have two production version with same lot size quantity and same validity date
On what basis system determines IN THE PRODUCTION OR PROCESS ORDERS.
The selection key in Material master is Production version only
Please explain the logic
Regards
Sasikanth
Request clarification before answering.
If we have two production version with same lot size quantity and same validity date
On what basis system determines IN THE PRODUCTION OR PROCESS ORDERS.
The selection key in Material master is Production version only
System will take first production version while running MRP, if the P V have same lot size quantity and same validity date.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi All
What is the basis for the Selecting the production version .
How the system identify this is the first production version ?
If i created Version with Number 1000, 1001
and if we kept 1001 as the first , Which version system will create ?
Regards
Sasikanth
Edited by: sasiaknth srinivas on Feb 22, 2011 10:29 PM
What is the basis for the Selecting the production version .
How the system identify this is the first production version ?system will check the validity date, from lot size and to lot size with requirement qty, if both the PV has valid on date having same lot size, System will take first created PV, if the first created PV is locked, then system will take second PV
If i created Version with Number 1000, 1001
and if we kept 1001 as the first , Which version system will create ?System will take first created PV, if 1001 is created as first then system will take 1001
Hi sasikanth,
MRP system will take first production version, then during conversion time (planned order to production order), you can change the production version manully
Regards,
Sankaran
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear
If the two production versions are same validity and lot size , then as a priority , it will take the frist Production version by default .Now , if you want to select the production version , then u can goto OPL8-Define order type depedent parameters -Produtcion Verion in Master Data tab -Keep -1-Manual Slection of production version while creation of Process Order or Production Order .
Or else , Lock the Procuction version which u do not want system should select duing MRP run or creation of Production order /prooces order , then un-lock production version will be selected automatically .
Hope it clarifies
Regards
JH
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 14 | |
| 12 | |
| 7 | |
| 6 | |
| 5 | |
| 4 | |
| 3 | |
| 2 | |
| 2 | |
| 1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.