505

Dear gurus,

In my process order ,in scheduling the time is not being taken though we have maintained parameters in resource and recipe.

Can anybody help?

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Likes

Dear Dhaval/Ram,

I checked both still it is not taking scheduling times.

dhaval_choksi3
Active Contributor
0 Likes

Hi,

Check Scheduling Result in Master Recipe itself.

Also check whether Master Recipe is selected or not in Process order.

Regards,

Dhaval

Edited by: Dhaval Choksi on Feb 6, 2009 1:11 PM

Former Member
0 Likes

It is not showing dates .if i put 6th feb 00 00 00 hrs and end date also 6feb 00 00 00 hrs

dhaval_choksi3
Active Contributor
0 Likes

Hi Saagrica,

Have you try to scheduled the order by pressing tab For Carry out scheduling?

This tab is there in Header data tab of process order.

Regards,

Dhaval

dhaval_choksi3
Active Contributor
0 Likes

Hi Saagrica,

Have you try to scheduled the order by pressing tab For Carry out scheduling?

This tab is there in Header data tab of process order.

Regards,

Dhaval

former_member196398
Active Contributor
0 Likes

Saagaric,

I would first suggest you to schedule the Master Recipe and check whether operations are getting scheduled, if it is not then you need to first the problem, which may be because of wrong "Forumla" or paramater assigned in resource or the resource is not maintained for Finite scheduling (capacity header).

Master reciepe can be schedule in the change transaction C202, and from menu you would find the option to schedule the recipe.

Regards,

Prasobh

Former Member
0 Likes

closed

Answers (2)

Answers (2)

Former Member
0 Likes

Hi,

Goto SPRO and do the below config.

Production -> SHopfloor Control -> Operations -> Scheduling -> Define Scheduling Parameters for the Order Type.

Goto the above node and select your Plant / Order Type / Prod Scheduler and double click ans goto detailed screen and config the Scheduling Control for detailed scheduling and provisde either Forward / Backward / Current etc.

Do the above config and check the Prod order scheduling and come back if reqd any.

regards

radhak mk

dhaval_choksi3
Active Contributor
0 Likes

Hi,

Check your Scheduling Parameter in T.code OPUZ for that Order Type.

Go to detail screen

In Detail Scheduling

Activate Check box for Scheduling and generate Capacity Req.

In Scheduling Control for detail scheduling

Activate Automatic Scheduling.

Check above settings and if not maintain then maintain it.

Regards,

Dhaval