Hi,

In discrete manufacturing (Prod Order), I have three operations,oper: 0020 is externally processed(Ctrl key PP02), after completing oper: 0010, WIP material is sent to sub contractor, which we want count (mean how many WIP has been sent to vendor). I am creating a WIP batch on oper:0010 confirmation and want to issue it to vendor and also want receive it from vendor when oper:0020 is completed.

Please help me in this solution.

0 Likes
View Entire Topic
rupesh_brahmankar
Active Contributor

Hello,

Subcontracting to send work in process batches to subcontractors is possible

If you have to support subcontracting operations within a manufacturing order you can use WIP batches to send the work in

process parts to a subcontractor.

Activate customizing for WIP Batch functionality business function

LOG_PP_WIP_BATCH

For externally processed operations, you can use the BAdI PP_OM_BD_BANF_HEADER_MATERIAL to transfer the header material or the relevant reference material of the production order to the purchase requisition.

An outsourced operation can be confirmed using the implementation of the Prepare Order Information for ERP (ICH_BIF_WO_INF_IN) BAdI.

Please refer this document on WIP batches.

Work in Process Batches (WIP Batch)

Also refer SAP notes

1473025 - FAQ: WIP batches

1958633 - WIP batch: API for creating WIP batch linkages

Best Regards,

R.Brahmankar

smhaque3
Discoverer
0 Likes

sdn1.pngHi Brahmankar,

Thank you for your reply, but I am stuck. Details are in attachment.

Order is created/released for header (sub con PR is created for operation 0020) and CO11N is done and during that time WIP batch is created for 199. Now I want to do mvmt - 541 for mat- 199,(so that when I will be doing GR for sub con PO this WIP batch will be consumed.) but unable to perform, since WIP is in block stock. So unable to proceed. Please help.

smhaque3
Discoverer
0 Likes

By the way I am using S4-1610