cancel
Showing results for 
Search instead for 
Did you mean: 
Read only

Material Master duplication problem

Former Member
0 Likes
4,613

Dear All,

Kindly provide your valuable advice to find the following.

--how many duplicate material codes exist in the system

--what naming convention can be given so that dupilcation might be avoided (presently system creates material number as internal assignment)

--cleaning materials from the system which are not used for a long time

--same materials with different material numbers which has Price control V and S

Regards

View Entire Topic
Former Member

Hi

To find the duplicate Materials, go to MARA, MARC or even you will know in MM60.

As you are telling, you have internal no. assignement, you need to control the creation of material ocdes with the descriptions only. You need to follow the specific rule for the material description & as per the policy of the company. How auithorisations have been given to the users to create the material code. You can have a single person authorisation to create all the material codes, so that he can have the trace of the materials created & also he can have the own logic to maintain the description. There would be lot of variations in the creation if u assign to the multiple users. Also, put the deletion flag to the materials permonently to the materials which you do not wish to use( materials either duplicate or Materials with Val. V & S).

Best way is to control the creation with only one user.

Thanks

former_member763168
Participant
0 Likes

Hi

You can find the duplicate materials in by going to se16n

Table are MARA, MARC and for checking material price control you can use table MBEW.

After identifications of material you can block the material for use by using transaction code MM06. This will help you to avoid anyone to use that material.

Now when you recieve request to create new material, then you can unblock the material and change the attributes of material which you require like description, material group or even price in MR21.

You can better fetch the data from system by joining the tables through LFA1.

Where you have same material with different codes just for different price control. It is better that you activate split valuation for that material where in you can use both price control fields for same material.

Regards

Chetandeep

Regards

Chetandeep