Dear All,
if i want to Forcast for 6 months
in which t-code i should give 6 months values
Regards
Madhu
Request clarification before answering.
Dear,
Maintain the MRP type as forecasting in material master & maintain the forecasting view in material master for the same .
There should be histrorical consumption date for forecasting for the material
1. Maintain Forecasting view in material master and enter the historical data and forecasting period within the Forecasting view.
2.Maintain MRP type VV in MRP-1 view
3. Carry out MRP in transaction MP30 for Individual material and MP38 for totsal Forecast at Plant level. The procurement proposals will be generated
Check this link,
Regards,
R.Brahmankar
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear,
MRP type Y2 & YD are not the SAP standard mrp type please check in OMI4.
If you use the customized mrp type no problem steps will remain same.
MRP Y2 & YD planning works based on the consumption (withdrawal) of components not on the requirements.
So there will be requirements creation for the part MRP type check the consumption history in material master.
Please try and come back.
Regards,
R.Brahmankar
Dear Brahmankar,
MRP Y2 & YD planning works based on the consumption (withdrawal) of components not on the requirements.
So there will be requirements creation for the part MRP type check the consumption history in material masterCan you let me know in detail abt ur above statement
Regards
Madhu
Dear,
Forecast use the consumption value from material master it will not consider the other requirement like sales As your MRP types are costimized so please check the setting with VV and Y2 , YD in OMI4
in Forecasting will be on the consumption value excute forcast.
Hope clear to you.
Regards,
R.Brahmankar
Dear Brahmankar,
Once again thanks
are you talking abt fields
For Y2
Forecast ind. - * ( optional forecast )
Consumption ind. forecast - G ( total consuption )
For YD
Forecast ind. - + ( obligatory forcast )
Consumption ind. forecast - G ( total consumption )
Plz let me kow how system will calculate in both the cases
Regards
Madhu
Hi,
Refer to the below link with your abaper. The code is for uploading 12 periods, so you might want to consider only 6 periods:
http://www.sapnet.ru/viewtopic.php?p=4011
Regards,
Vivek
Hi,
In terms of how to do it in the system you've got it right, but from a business point of view, forecasting is one of the key aspects. So unless there is an in-depth understanding of the business & proper interpretation & impelementation, a forecast calculation done by the system can lead to false results. I have come across & read several cases where forecasting has got it wrong. So exercise caution while working with it if you've not done it already.
Good luck.
Regards,
Vivek
Dear,
Yes right, in the material master forecast view, you have History periods No of Periods to be considered as Historyand Forecast period No of periods for which Forecast is to be calcualated are maintained also Fixed period field. which will control for how many periods forecast should not be changed.
Go to MP81 enter your Forecast profiles PBA2 then go to selection and change Number of forecast periods as you want.
Forecast values are transferred to the demand management (Transaction MD70 or report RM60FORC) with the forecast periods being defined according to a fiscal year variant (period indicator 'P').
Hope this will clear to you.
Regards,
R.Brahmankar
Hi Madhu,
Would you be able to explain the MRP code Y2 in detail to me? (Including an example if possible).
I take it from reading the post, a planned order is triggered by consumption (actual demand) not forecast?
Does MRP use the SS as a trigger or the ROP? And if you have both loaded which would it trigger off of?
Thanks,
L. Moriarty
| User | Count |
|---|---|
| 13 | |
| 12 | |
| 6 | |
| 6 | |
| 6 | |
| 4 | |
| 3 | |
| 2 | |
| 1 | |
| 1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.