Hi..

i have one finish material , which having five operation. Out of five third operation (Op.30) is external processing operation . Finish material use "metal rod "as a raw material.

After creation of production order system has cretaed PR for third operation.

Now I issued the" metal rod " for the first and second operation . After processing , third operation is External Processing,but my store person not getting the material in stock .Asi issued the metal rod for start the operation.

How should i deal with this condition.

What componenets i should maintain in routing of finish material.How store peson get the stock of material.

What is ideal case fro external process operation ??

Plasehelp out

Thnks

0 Likes
View Entire Topic
Former Member
0 Likes

Hi

Please check the control key of the work centers assigned for operation 2.

To get as stock control key - PP03 need to be maintained and for thrid operation which is externally processed control key should be PP02

Also ensure current components are allocated thru component allocation.

PP03 - Routing - in-house prod. auto. goods rct

PP02 - Routing/Ref. op. set - external proc.

Regards

Manikandan .J

Former Member
0 Likes

Thnaks for reply..

what will happened if i defined this key in operation. please explain

Former Member
0 Likes

please explain me again