Dear all , please gvie me a direction which is right:
&1 if there are multiple routings matching the selection criteria, the first one is selected by default(for automatic routing selection)...from SCN
&2 If several routings match the selection criteria equally well then all of them are displayed...from SAP help
i thought &2 is right , but i tested that &1 is right in my system. No production version using , the routings header information are the same except the 'valid from' date.
Request clarification before answering.
Hello
Routing selection in MRP will be by default first one.But selection of routing in Production orders is based on the setting you have maintained in order type dependent parameter OPL8 i.e automatically or manually.
Regards,
Velmurugan S
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 13 | |
| 13 | |
| 7 | |
| 7 | |
| 5 | |
| 3 | |
| 3 | |
| 2 | |
| 2 | |
| 2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.