‎2008 Mar 13 5:36 AM
hi,
can we restrict some UOM not to order or make GRN in part
ex: EA, BAG...uom, system is allowing to make PR/PO or GRN for 0.01, 0.5,... but i need to have control on the same.
means such uom can be ordered in full like 1,2,3,.... and not in 0.5,0.2..etc.
i posted the same in MM forum, but have got an suggestion to post in this forum.
please help...
‎2008 Mar 15 10:03 AM
have you tried
SPRO "Unit of Measure Rounding Rules" ?
In this step, you define the rounding up/down rules for grouping the units of measure for rounding purposes.
For units of measure assigned the same rounding rule, you can optimize the rounding process using rounding profiles.
The fields, %Up or %Down, indicate the percentages from which the system is to automatically round up or down to a complete logistics unit.
For a percentage of 100 for %up or 0 for %down, the system does not round either up or down. A percentage of 0 for %up or 100 for %down, means that the system is always to round up/down to a multiple of the assigned logistics unit of measure.
‎2008 Mar 17 3:35 AM
hi,
thank u.
can u throw some more information on this..
how to do Unit of Measure Rounding Rules
my requirement is user should not use decimal qty for creating the documents for UOM EA only